GS EPS Bugok 3 Combined Heat Power Plant, Bugok

부곡 화력발전기 3호기 열병합 발전소
Slide 0
The Bugok Thermal Power Plant Unit 3 is a combined heat and power plant with a capacity of approximately 500 MW, constructed with an investment of 450 million dollars. This plant achieves high thermal efficiency through a combined cycle power generation method utilizing gas turbines and steam turbines.
Client
GS EPS
Location
Dangjin, Chungcheongnam-do, Korea
Site Area
Floors
Program
Petro-Chemical & Biomass
Gross Floors
Structure