Incheon Fuel Cell #1 & #2

인천 연료전지 1단계 & 2단계
Slide 0
The first phase of 15.84MW and the second phase of 15.84MW were installed at the Incheon Power Headquarters of Korea Midland Power Co., Ltd. and more phases are being planned so a large-scale double-layer fuel cell town will be formed.
Client
Kumho E&C
Location
Incheon
Site Area
Floors
Capacity Phase 1 : 15.84 MW / Phase 2 : 15.84 MW
Program
Fuel Cell
Gross Floors
Structure
Type PAFC